Abstract:Based on the investigation on the distribution of liquefied saturated sand in the planned district in Langfang of Hebei Province and study analysis on the hazard, vibro replacement stone column, pile foundation and CFG pile composite ground technology were suggested to control the saturated sand liquefaction.