Exploration and Practice of Gushing Water Treatment in Mudstone Layered Fracture Zone
DOI:
Author:
Affiliation:

Clc Number:

TV543

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Foundation treatment is usually difficult for large water conservancy project on the mudstone which generally has poor geological conditions. The dam foundation of Hattashan hydro-junction project was constructed on flat mudstone; the stability and security of the dam foundation were seriously affected by the deep layered fracture zone. Analysis on the outgush infiltration channel was made and a series of grouting method were taken. This approach not only saves cost, but also ensures the construction quality. The article summed up the treatment method of special gushing water in the mudstone on the basis of the large water inrush in powerhouse water collecting well and in the P7 fracture zone; it is worth to be the reference.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 28,2010
  • Revised:January 28,2010
  • Adopted:February 28,2010
  • Online: July 07,2010
  • Published: June 25,2010