Risk Assessment Model for Slope Pre-stressed Anchor Engineering in a Contract Section of Zangmu Hydropower Station
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TV512

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    There are many risk factors and uncertainties in the slope pre-stressed anchor engineering construction in a contract section of Zangmu hydropower station, so the project management is very difficult. The risk assessment index system was established, index weight analysis was conducted by using three-demarcation method and AHP, fuzzy comprehensive evaluation model was introduced, the managers and experts’ experience was changed from qualitative to quantitative, and quantitative assessment of the project risk was made with the result of “high risk”. All of the above offered the basis for further project management scheme establishing.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 04,2010
  • Revised:February 04,2010
  • Adopted:May 14,2010
  • Online: July 22,2010
  • Published: July 25,2010
Article QR Code