Construction Technology of Hole Deviation Control for Horizontal Pre-stressed Anchor in the Underground Powerhouse System of Jinping First Stage Hydropower Station
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reinforced support was made for the side wall, altered rock and large fault of the main engine compartment, main transformer room and bus cavern in underground powerhouse of Jinping 1 hydropower station by the horizontal pre-stressed anchor. In the construction process of pre-stressed horizontal anchor, according to the different geological formations, hole deviation was basically solved by strict control methods with continuous improvement.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 30,2010
  • Revised:March 30,2010
  • Adopted:April 14,2010
  • Online: November 24,2010
  • Published: November 25,2010