Abstract:In long spiral CFG pipe construction, attention should be paid on pile position control, pile foundation construction, concrete quality, construction measures in winter, thickness of cushion and protection after pile-forming to avoid appearing quality problems. The experience summary and the discussion on above issues were made in this paper.