Construction Practice of River Drilling in Flood Season
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By the engineering case, the paper introduced the selection of drill ship & equipment, drill ship assembling & anchoring positioning, drilling technology & calculation method of kelly overstand and footage per run for river drilling of bridge foundation investigation in flood season. The attentions on river drilling construction were emphasized.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 08,2010
  • Revised:May 31,2010
  • Adopted:May 31,2010
  • Online: September 09,2010
  • Published: September 25,2010