Abstract:Percussive or bored pile construction is difficult in karst area with long project period, high cost and low efficiency because of various borehole accidents. Based on the practice of geological investigation, design, supervision, technical advisory and construction management, the paper summarized the causes and prevention methods of various borehole accidents and put forward the relevant suggestions.