Technical Difficulties in Large Diameter Well Drilling in Coal Mine Construction and the Countermeasures
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on a well drilling engineering of a mine in Shandong, the paper introduced the advantages and difficulties of construction without surface casing drilling with the countermeasures. The construction of 2 wells were fulfilled ahead of time through deviation control by tower drilling tools, inclination survey by gyro inclinometer, wall protection by high-quality mud and working intensity reducing by buoyancy device and impact wrench. Drilling without surface casing greatly saved the construction cost.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 13,2010
  • Revised:May 13,2010
  • Adopted:October 27,2010
  • Online: December 28,2010
  • Published: December 25,2010