Construction Technology of Combined Seepage Draining in Tailings Reservoir of Xiangshan Pyrite Mine
DOI:
Author:
Affiliation:

Clc Number:

TU472.3+;TD745+.22

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the successful experience of the application of combined seepage draining technology with horizontal drainage hole, gravel pile and blind ditch in a tailings reservoir of Xiangshan pyrite mine, the paper introduced the construction process of horizontal drainage hole in tailings reservoir and the application prospect of this technology.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 21,2010
  • Revised:January 03,2011
  • Adopted:February 12,2011
  • Online: March 29,2011
  • Published: March 25,2011