Casing Failure in Large Diameter Project Well and the Prevention Technique
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Incomplete casing, case breaking, drilling rod cementing and case collapsing often occur in the construction of large diameter coal mine gas emission well, ice transmission cooling-well, nitrogen injection well and feeding well in China in recent years. The paper analyzed the failure causes according to the study on common accident of large diameter project well, and put forward the prevention measures.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 12,2010
  • Revised:August 07,2010
  • Adopted:August 10,2010
  • Online: September 08,2010
  • Published: August 25,2010