    The principle and characteristics of freezing construction is introduced and the situation of freezing borehole of 1# auxiliary shaft of Liutangfang iron mine is described. The paper analyzed the difficulties and the technical measures in the engineering construction, introduced the attentions and steps in the construction and summed up the operation.