Construction Technology of Reversed Pendent Hole in Sand Gravel Stratum
DOI:
Author:
Affiliation:

Clc Number:

P634.5;TV221

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the difficulties of borehole deviation, in-hole collapsing and block-falling, coring and installation in construction in sand gravel stratum, the corresponding technical measures were taken with good construction effect. The paper introduced the construction technology in sand gravel stratum of Hongye power station.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 14,2010
  • Revised:November 01,2010
  • Adopted:December 11,2010
  • Online: March 01,2011
  • Published: February 25,2011