Technology of Rotary Jetting Pile Curtain Construction in Ultra Large Deep Foundation Pit in Dalian Coastal Area
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Because of the artificial backfilling, the geological and hydrological conditions are complicated in Dalian near sea region, which was alluvial marine sedimentation terrace. The natural deposit soil and rock exists with strong permeable backfilled miscellaneous soil-filling. Pile foundation pit enclosure structure, water-proof curtain and deep well point dewatering were adopted for ultra large deep foundation pit excavation. By 2 pile tests and process parameters optimization, it was proved high pressure jet grouting pile waterproof curtain achieved ideal effect.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 10,2010
  • Revised:August 10,2010
  • Adopted:November 22,2010
  • Online: December 28,2010
  • Published: December 25,2010