Construction of Zhantou Road Tunnel with Blasting and Excavation
DOI:
Author:
Affiliation:

Clc Number:

U455.4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Description is made of the vibration reduction blasting technique and the excavation method, as well as the use of construction measurement and vibration velocity monitoring in tunnel excavation in respect of the engineering characteristics and excavation difficulty of the Zhantuo road tunnel.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 18,2010
  • Revised:August 18,2010
  • Adopted:December 20,2010
  • Online: March 01,2011
  • Published: February 25,2011