Determination of Timing for Supply of Advance Flushing Fluid in Boreholes with Full Lost Circulation
DOI:
Author:
Affiliation:

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In core drilling, drillers are often obsessed with when advance flushing fluid should be supplied in fully lost boreholes. Two methods about how to determine the supply time are put forward and compared with each other for drilling of lost boreholes.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 03,2010
  • Revised:September 03,2010
  • Adopted:January 03,2011
  • Online: March 29,2011
  • Published: March 25,2011