Test of High Pressure Consolidation Grouting without Concrete Covering in Jingping Ⅱ Hydropower Station
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TV554+.13

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The functions of high-pressure consolidation grouting for hydraulic tunnel are strengthening the tunnel wall rock, sealing rock cranny around the tunnel, increasing the wall rock’s integrity and capability of anti-distortion, strengthening the wall rock’s impermeability and long-term seepage stability. This article has mainly introduced the tests and the effects of high-pressure consolidation grouting works for diversion tunnel without concrete liner, and provided the basis for grouting design and construction of the tunnel engineering.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 16,2010
  • Revised:December 16,2010
  • Adopted:March 03,2011
  • Online: May 30,2011
  • Published: May 25,2011
Article QR Code