Drilling Technology in ZK1122 Open Hole of Kangjiawan Lead-zinc Mining Area
DOI:
Author:
Affiliation:

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To ensure ZK1122 open hole construction, low solid mud was used in common formation with proper lubricant to reduce friction resistance; strong inhibitor was used to maintain the borehole wall stability in water sensitive formation; weighted mud was used in special stress formation. And according to the different formation and different construction depth, different bottom hole assembly was selected. Thick core barrel, ladder bit with long matrix and with more hole reamer and centralizer ensure construction safety and efficiency. By the strict drilling regulation and site management, deep open hole drilling construction in complex formation was fulfilled.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 10,2011
  • Revised:August 30,2011
  • Adopted:April 17,2011
  • Online: September 28,2011
  • Published: