Discussion of Borehole Wall Stability Technology in Broken Formation and the Practice
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    For the drilling construction in broken formation, it is important to improve the cementation of fractured rocks, rapidly seal the formation fracture to form whole borehole wall and use proper flush fluid for borehole wall stability. With anti-sloughing lost circulation agent while drilling and modified asphalt, the effective formation fracture sealing and higher borehole wall bearing strength can be obtained. The LBM and grafted starch flush fluid systems have good wall building property and rheological property with good application effect for the construction in broken formation.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 12,2011
  • Revised:September 13,2011
  • Adopted:April 17,2011
  • Online: September 28,2011
  • Published:
Article QR Code