Treatment of Sticking Accident in a Geothermal Well
DOI:
Author:
Affiliation:
Clc Number:
TE28
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
According to the frequent sticking accident in drilling construction, analysis was made on the causes and related factors. Sodium hydroxide solution was used as spotting fluid; the paper introduced the operation method and the effect.