Grouting for Water-proof of Surface Drilling in Qingfeng Coalmine of Changde
DOI:
Author:
Affiliation:

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper briefly analyzed the hydrogeology conditions and water inrushing factors, and the water-proof plan was established. The division of grouting section, slurry matching ratio in the water-proof grouting procedure and grouting ending standard were discussed.