Discussion of the Solutions to the Borehole Accident in Geological Drilling
DOI:
Author:
Affiliation:

Clc Number:

P635.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Drilling is a direct and effective means for getting geological material. During the drilling period, the complex conditions are frequently encountered such as strata leakage, hole wall collapsing and diameter shrinking, etc. Due to the unstable borehole wall, drill sticking and burying often happen. If it is not timely and properly treated, borehole scrap would be inevitable. In order to get the core fast, safe and accurate, the rule “prevention first, prevention & treatment combination” should be obeyed from the initial design. With the case of Shanggong gold mine, the principle of one level diameter reserved before drilling and drilling with casing & drilling fluid plugging were summarized, which could be the technical reference for the subsequent drilling work.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 24,2011
  • Revised:August 30,2011
  • Adopted:August 08,2011
  • Online: October 28,2011
  • Published: October 25,2011