Water Decontamination and Recharge Treatment in Coalmine
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TD74

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Large amount of wastewater is discharged to the ground surface in coal mining with environment pollution. Large-diameter recharge well and water decontamination plant are constructed to solve the problem. After the treatment, part of mine drainage is used in coal production and the rest is injected into the ground through recharge well to realize water resource cyclic and energy-saving & emission reduction. With the project case of Wutongzhuang mine, the water decontamination and recharge treatment are introduced.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 28,2011
  • Revised:April 28,2011
  • Adopted:July 17,2011
  • Online: December 29,2011
  • Published:
Article QR Code