Abstract:This article analyzed the major risks and serious consequences in the large slurry shield construction of Nanjing Yangzte River tunnel under the complicated geotechnical and hydrological conditions. The engineering risks were evaluated and summed up by experts and professional engineers with prevention measures. The emergency countermeasures were formulated to reduce and prevent the major safety and quality accidents.