Construction Method of Rectification and Consolidation for Pile Foundation of Bridge
DOI:
Author:
Affiliation:

Clc Number:

U445.7

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The lateral shift was found in the 2-4 spans of a bridge position with cracks even fracture after a bridge construction and rectification and consolidation must be made without demolishing the bridge. By research and demonstration on schemes of bridge rectification and consolidation, a group of convenient, practical and economic construction method was summed up. The paper introduced the consolidation scheme, construction technical measures and rectification effect.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 07,2011
  • Revised:October 17,2011
  • Adopted:November 05,2011
  • Online: December 29,2011
  • Published: