Renovation of Frozen Harzard of Subgrade Surface by Cross Water-collecting Pipe for Shijiazhuang-Taiyuan Passenger Dedicated Railway
DOI:
Author:
Affiliation:

Clc Number:

U418.6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Most of the subgrade of Shijiazhuang-Taiyuan passenger dedicated railway is located in loes section. This raiway was put into operation in 2009, but a large amount of frozen harzard occurred in the first winter and most was in subgrade. The renovation was made by engineering measure of cross water-collecting pipe with good effect.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 02,2011
  • Revised:September 02,2011
  • Adopted:December 27,2011
  • Online: January 10,2012
  • Published: January 25,2012