Common Problems in Fujian Coalfield Drilling and the Treatment Measures
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634.4+1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The collapsing, water inflow, leakage, karst cave, old cave and hole shrinking are often encountered in Fujian coalmine field drilling, the drilling quality, efficiency and construction cost were seriously affected. By the long term study on drilling practice, a set of drilling technical process was formed for Fujian coalmine field. Some common problems and treatment measures of Fujian coalmine field drilling were summed up.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 02,2011
  • Revised:September 02,2011
  • Adopted:September 02,2011
  • Online: September 28,2011
  • Published:
Article QR Code