Construction Difficulties in ZK7924 Hole of Surrounding Mining Area of Makeng
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper mainly introduced the drilling technical difficulties in ZK7924 hole of surrounding mining area of Makeng and the successful construction; described the flushing fluid, wall protection and leakage control, the correlating technical parameters and the calculation methods of water exchange amount of cement slurry.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 02,2011
  • Revised:September 02,2011
  • Adopted:September 02,2011
  • Online: September 28,2011
  • Published:
Article QR Code