Production Technique Research on Shield Segment Precast for Nanjing Changjiang River Tunnel
DOI:
Author:
Affiliation:

Clc Number:

U455.43

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the case of shield segment precast for Nanjing Changjiang tunnel, the precast technique of large diameter shield segment was introduced, and the control measures for precast production technique of high intensity and high permeability-resistance segment were summed up.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 10,2011
  • Revised:October 10,2011
  • Adopted:December 27,2011
  • Online: January 10,2012
  • Published: January 25,2012