Drilling Construction Technology of φ3.8 m Bored Grouting Pile in Jiaxing-Shaoxing River-spanning Bridge
DOI:
Author:
Affiliation:

Clc Number:

U443.15+4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The drilling construction technology of borehole with super-large diameter of 3.8m in Jiaxing-shaoxing river-spanning bridge is introduced: steel casing sinking, mud circulation system arrangement, drill and bit selection, performance of wall protection mud and technical parameters determination and main technical measures in drilling construction process.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 13,2011
  • Revised:October 15,2011
  • Adopted:December 20,2011
  • Online: January 10,2012
  • Published: January 25,2012