Drilling and Completion Technology Used in Horizontal Well of Zhenjing Oilfield
DOI:
Author:
Affiliation:

Clc Number:

TE243

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To evaluate economic and technical feasibilities of Chang 8 reservoir in Zhengjing oil field developed by horizontal well, HH37P1 well was arranged. The construction difficulties were analyzed with corresponding technical measures. By optimizing bottom hole assembly, controlling well trajectory, regulating drilling fluid properties and combining corresponding engineering technology, HH37P1 horizontal well was successfully drilled. The combination of logging data and logging showed the initial success by using presetting pipe string completion and following fracturing reformation. The successful implementation of HH37P1 horizontal well provides a new approach to effective development of Zhenjing oilfield.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 20,2011
  • Revised:May 24,2012
  • Adopted:May 29,2012
  • Online: June 29,2012
  • Published: