Drilling Construction Technology in Sakoa Coalfield of Madagascar
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This article describes the drilling construction process in complex formation of Sakoa coalfield with fully hydraulic driving drill in Madagascar; the construction difficulties in broken and leaking layers were overcome. The comparison was made on the advantages and disadvantages of fully hydraulic driving drill and spindle drill and introduced the construction conditions with foreign drill rig.