Abstract:Wall-sticking and sand bridging happened in the geothermal well drilling construction in Huaiyang of Henan. After pulling, natron infiltrating and blasting, there were still several pieces of drilling tool remained; and finally the remained tools were taken out by casing milling. This experience can be reference to the similar engineering.