    Drilling design and optimization were researched. The development of casing program in block 1 of central Junggar Basin was discussed with the casing program optimization scheme put forward; a bit selection scheme was recommended base on the rock drillability profile and the evaluation of bit performance; and drilling fluid system optimization and application was also introduced. Drilling design for block 1 of central Junggar Basin was formed and the future research direction was presented.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 15,2011
  • Revised:December 15,2011
  • Adopted:March 29,2012
  • Online: May 24,2012
  • Published:
Article QR Code