Well Trajectory Control Techniques for the Staircase Horizontal Well Jin 31-Ping 2
DOI:
Author:
Affiliation:

Clc Number:

TE243

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Staircase horizontal well is one way of horizontal well development, it has longer section and more control area, and it also can simultaneously mine different oil layers. Starting from the difficulties in well trajectory control and taking the example of well Jin 31-Ping 2, the paper introduced the geological design and well trajectory design schemes with the well trajectory control idea and methods. By the analysis on the key technology, the implementation focus and the supporting technical measures for staircase horizontal well were described.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 30,2011
  • Revised:December 30,2011
  • Adopted:February 13,2012
  • Online: March 19,2012
  • Published: