    PHC pipe pile foundation was used in the first phase project of Huawei production base in Langfang, which was the first application in Langfang area. The paper briefly introduced the PHC pipe pile foundation about its construction method, the characteristics and the testing result. The practice shows that PHC pipe pile foundation can yet be regarded as a good method for foundation treatment in Langfang area.