Practice of Post-grouting Technology for Bored Pile and the Effect Analysis
DOI:
Author:
Affiliation:

Clc Number:

TU473.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The construction of post-grouting technology for bored pile in Zhengzhou is presented with the static loading test results of a single pile; and by the economic benefit analysis on the post-grouting for bored pile construction, it is elucidated that post-grouting technology is an effective measure to improve bearing capacity of single bored pile with good technical and economic benefits.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 06,2012
  • Revised:April 18,2012
  • Adopted:June 27,2012
  • Online: July 30,2012
  • Published: