Abstract:The construction of post-grouting technology for bored pile in Zhengzhou is presented with the static loading test results of a single pile; and by the economic benefit analysis on the post-grouting for bored pile construction, it is elucidated that post-grouting technology is an effective measure to improve bearing capacity of single bored pile with good technical and economic benefits.