Construction Technology of Slope Reinforcement in Shilong Power Station of Songjianghe
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U417

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Combined pile-anchor supporting system with small diameter anti-slide pile and anchor rod was adopted for slope reinforcement in Shilong power station of Songjianghe, which replaced simple large diameter anti-slide pile and realized the application of large equipment in steep slope. Borehole collapsing and water as circulating medium in artificial backfilled stone layer were solved by DTH hammer drilling technology. The paper introduced the slope reinforcement scheme and construction technology in Shilong power station of Songjianghe.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 06,2012
  • Revised:March 26,2012
  • Adopted:April 15,2012
  • Online: May 25,2012
  • Published:
Article QR Code