Discussion on Drilling Construction Method for a Contract Section of Deep Prospecting Project in Xiaoqinling
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Discussion is made on drilling construction of borehole wall protection & leakage control, borehole structure, accident prevention and treatment method in the deep prospecting project in Xiaoqinling, especially the application breakthrough of washing fluid with strong wall protection performance and multilevel casing technology basically resolved construction difficulties in thick overburden with buried depth of 600~800m in quaternary and tertiary with fault gouge.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 20,2012
  • Revised:June 20,2012
  • Adopted:May 08,2012
  • Online: July 30,2012
  • Published:
Article QR Code