Abstract:The development process of a new rapid anchoring technology applied in vertical high fill slope control project is introduced, that is horizontal direction rapid anchoring cable by pre-stressed concrete tube. The mechanical principles, the structure and the features were described, and the construction process and the technical points of the new rapid anchoring cable were introduced with engineering case.