Comprehensive Control on Water and Gas Mixing Spewing in Hydrologic Drilling of Underground Coal Mine
DOI:
Author:
Affiliation:

Clc Number:

P634.8

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Water and gas mixing spewing was encountered in the construction process of coal mine hydrogeology drilling, which is a serious threat to the construction safety. The grouting plugging was tried with failure. 3 sets of device of drilling tool blowout preventer, orifice flexible sealing blowout preventer and flooding closed water-gas separator for integrated control were designed and applied with obvious effects.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 06,2012
  • Revised:June 28,2012
  • Adopted:July 22,2012
  • Online: October 24,2012
  • Published: