Abstract:Based on the geological features of earth-rock compact parts and drainage hole construction requirements for tailings dam of Geerma gold mine in Maqu of Gansu Province, and by the technical and economic analysis, the construction plan of inclined drainage hole for tailings dam was optimized, pipe reamer trenchless technique was successfully applied in the construction with good effects, which could be the reference for the similar project.