Abstract:As gravity dam, dual-axis mixing pile process is mainly used in the small-scale and shallow foundation pit. This paper presents an engineering case, in which the large-scale foundation pit is near river, subway and residential districts, but dual-axis mixing pile gravity dam has been successfully applied. The design checking calculation and construction process are introduced.