Application of Wire-line Coring Hydro-hammer in Xiaoqinling Gold Ore Deposit
DOI:
CSTR:
Author:
Affiliation:

Fourth Geological Prospecting Team of Henan Geological and Mineral Bureau,Fourth Geological Prospecting Team of Henan Geological and Mineral Bureau,Fourth Geological Prospecting Team of Henan Geological and Mineral Bureau,Faculty of Engineering, China University of Geosciences

Clc Number:

P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The paper introduced the application of SYZX75 wire-line coring hydro-hammer in Xiaoqinling gold ore deposit of Lingbao City of Henan Province with the application effects. The field trial results show that the unit monthly drilling efficiency, average hour efficiency, round trip length and core recovery rate in cracked formation are improved obviously with lower drilling cost and better protection effect of borehole deviation.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 20,2012
  • Revised:August 20,2012
  • Adopted:January 15,2013
  • Online: March 07,2013
  • Published:
Article QR Code