Construction Technology and Experience of WFSD-3 Hole of Wenchuan Earthquake Fault Scientific Drilling Project
DOI:
Author:
Affiliation:

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The WFSD-3 hole is one of the series of boreholes of Wenchuan earthquake fault scientific drilling project. During 2 years’ construction, many technical challenges, such as drilling in complex strata, large diameter undisturbed core sampling and borehole wall protecting under high geo-stress were overcome. This article especially focused on the construction technology and experience of the WFSD-3 hole and discussed some technical problems.