Discussion on Casing Installation for Methane Drainage Vertical Borehole and Cementing Process in Coalmine
DOI:
Author:
Affiliation:

Yangquan Coal Infrastructure Engineering Management Department,Yangquan Xinyu Geotechnical Engineering Co., Ltd.

Clc Number:

P634.5;TD712

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the construction process of methane drainage vertical borehole in coalmine, the casing installation and cementing are very important. By the construction practice of methane drainage vertical borehole and cementing process in Pingshang coalmine, this article presented some lessons from the accident and summed up the experiences of casing installation and cementing for the similar projects in the future.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 11,2012
  • Revised:November 18,2012
  • Adopted:January 22,2013
  • Online: March 07,2013
  • Published: