Abstract:This article introduced the construction technology of Shierlihe beam-type aqueduct large diameter pile foundation spiral borehole for south to north water transfer project in the second bid section in Nanyang and the related technical requirements; analyzed the construction process, new testing methods and main points of quality control for construction in plastic soil.