    A 19.28m complete concrete core sample was successfully removed in RCC dam of A’hai hydropower station. The article introduces the coring technology for long concrete cores in drilling equipment selection, drilling material selection, drilling parameter setting and adjustment, core samples pulling breaking and removing out, core positioning and post maintenance.