Cantilever Type Double-row Piles Retaining and Groundwater Treatment for Deep Foundation Pit in Saturated Sand
DOI:
Author:
Affiliation:

Shenzhen Branch of China Jingye Engineering Co. Ltd.,Shenzhen Branch of China Jingye Engineering Co. Ltd.,Shenzhen Branch of China Jingye Engineering Co. Ltd.,Shenzhen Branch of China Jingye Engineering Co. Ltd.,Shenzhen Branch of China Jingye Engineering Co. Ltd.

Clc Number:

TU473.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With field cases, the comparison and selection were made on commonly used foundation pit support and water-stop methods; the introduction was made on the double-row piles retaining and high-pressure rotary jet grouting water-stop curtain in saturated sand deep foundation pit. Based on the theoretical calculation and monitoring data, the supporting effect was analyzed, and the application of high-pressure jet grouting water-stop technique was discussed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 05,2013
  • Revised:January 05,2013
  • Adopted:January 22,2013
  • Online: April 23,2013
  • Published: