Application Discussion of Pressure Grouting Technology in Large Bridge of Karst Foundation at Beijin-Fuzhou Passenger Dedicated Line
DOI:
Author:
Affiliation:

Jingfu Mingan Railway Passenger Dedicated Line Co., Ltd.,Changjiang Engineering Vocational College

Clc Number:

U443.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the complex karst characteristics near No. 30 and 31 piers of the large bridge at Beijin-Fuzhou passenger dedicated line and by the repeated discussions, the foundation treatment plan was decided to take pre-reinforcement of dissolved cavity fillings by pressure grouting. The paper introduces the construction processes, attentions and late quality detection, which can be the reference to the similar engineering.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 08,2013
  • Revised:March 12,2013
  • Adopted:April 07,2013
  • Online: May 24,2013
  • Published: