Test and Research on Technology of Deep Hole Completion for Anchor Cable in Accumulation Body
DOI:
Author:
Affiliation:

Sichuan Tuozhan Constructive Engineering Co., Ltd.,Sichuan Tuozhan Constructive Engineering Co., Ltd.,Sichuan Tuozhan Constructive Engineering Co., Ltd.,Sichuan Tuozhan Constructive Engineering Co., Ltd.

Clc Number:

TV54

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    It is hard to complete a deep hole for anchor cable in thick accumulation body, especially for those with depth of more than 80 m. In Zhentouba first stage hydropower station, in order to complete the deep hole in 1# accumulation body, the combination of single layer casing and wall protection grouting was selected. The practice shows that this technology is effective to complete deep hole for anchor cable in accumulation body.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 23,2013
  • Revised:January 23,2013
  • Adopted:April 24,2013
  • Online: June 25,2013
  • Published: